GRABER LTD - IN PROGRESS
RIMSTING, CHIEMSEE
2018
.Current
Architecture
Architecture
The change and extension of a site development plan completed by Studio Knack has led, together with Graber Ltd., to the design of a company building in Rimsting.
The cubature of the building was created by joining the three floors together. This approach is based on an urban planning concept that allows for an adequate integration of the large building within the rather small surrounding developments. Besides the generous warehouse the structure comprises workshops and an administration block. The innovative workspace distribution creates a diverse operating environment.
The projekt is expected to be carried out in 2018.